Carrie and Carole have been painting cupboard doors and locker lids.
Following the hard work that Dave and Carole put in I have applied another primer undercoat has gone onto the stern and starboard side. This has covered the area well and you can see the difference between the two sides. I will get three coats of primer undercoat if I can before sanding down for the top coats.
New hole cut into hull for the speed log housing to be fitted.
A timber frame has been installed to suspend the engine from. The engine is now at cabin floor level so that I can gain access and remove the shaft coupling.
The ultra flex B85 single lever engine control has been removed and renovated ready for reinstatement.
More halyards have been spliced ready for installation on the mainmast.