Today is 5th February. It was snowing this morning. I have been varnishing the deck beams in the fore-cabin.
Blow heater is on and the boat is tolerably warm however ventilation is essential so ‘fresh’ is the word of the day.
This last month or so has been doing home stuff and occasional boat stuff. The main hatch is being repaired and a new slide section has been fabricated. The new rigging is ready ( not that the masts are). The rudder shaft has been fabricated and I just need to pick it up this week.
Lots of work to do to get Anne Marie ready for June. More pension drawdown required.