Alan is really steaming ahead with the interior. Here you can see the new galley with sink on the left, cooker in the centre and the new fridge on the right. On the extreme right is a deep cupboard (because there’s space). At the back there will be cupboards and shelves with deep lockers in front for food and wine.
What you can’t see is the work starting on the quarter berth to the left, the ducting that has been installed for wiring, the improvements to the dining area and the work done to the fore cabin. I have included a a shot of the new shelves in the fore cabin though.
On other matters –
We handed the rigging to RigitUK last weekend and they are now manufacturing a complete set of shrouds and stays. I have found a couple of snapped mast fittings which I need to get repaired – nothing drastic thank goodness.
Carrie and I also put another layer of plywood on the main cabin deck last week which I will epoxy tomorrow, weather willing. Alan has had a real mission to repair the teak trim around the main cabin but it will look great when back in place. There is still more plywood to fix when the trim is done.
Thank goodness for people who know what they are doing.