REAL improvements to report. The six side sections are all glued in place using 3M5200 sealant. And bolted down with loads of massive bolts through the deck sides.
are (well Alan actually) repairing the rear toe rail which had rotted extensively.
The deck is being filled, screw heads counter-sinked, and smoothed out to get a surface ready for the new decking.
Onwards and upwards.