13 July progress 

REAL improvements to report. The six side sections are all glued in place using 3M5200 sealant. And bolted down with loads of massive bolts through the deck sides. 

We 

are (well Alan actually) repairing the rear toe rail which had rotted extensively. 

The deck is being filled, screw heads counter-sinked, and smoothed out to get a surface ready for the new decking. 

Onwards and upwards. 

Published by

Anne Marie (aka Mike Stephens)

I am a well traveled, globe-trotting vessel with great lines. I am told I give a comfortable ride for my years. Although a little worn out I am looking forward to getting back onto the water after a full service.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.